Even as some locks on the Upper Mississippi River are tentatively scheduled to reopen in early April, fresh snowmelt and high water may extend their closures further. The Upper Mississippi… Read More
lock closure
The Mississippi Valley Division of the Corps of Engineers agreed with industry requests to move the date of the scheduled closure of Lock 25 from March 22 to March 8. Read More
The New Orleans Engineer District reports that a repair project at Bayou Boeuf Lock has been extended through November 15. The lock was originally scheduled to reopen about October 15. Read More
The Vicksburg Engineer District announced August 17 it has awarded an emergency contract to Leawood, Kan.-based Massman Construction Company for repair work at Columbia Lock, located on the Ouachita River… Read More
The New Orleans Engineer District has announced the most up-to-date closure schedules for three locks on the Gulf Intracoastal Waterway in South Louisiana. Bayou Boeuf Lock, which recently had its… Read More
A year-and-a-half’s worth of reality has set in for operators on the Gulf Intracoastal Waterway who move tows through Calcasieu Lock, located in Cameron Parish, La., just south of Lake… Read More
The scheduled repairs to the main lock chamber at Melvin Price Locks and Dam at Upper Mississippi Mile 200.8 in Alton, Ill., just north of St. Louis, were completed and… Read More
Following minor delays both at the lock and a nearby drawbridge, the Harvey Canal Lock is set to reopen to navigation December 17. The lock closed on September 6 for… Read More