Higher-than-average releases from all Missouri River mainstem system dams will continue through the fall, and the navigation season on the river will be extended by 10 days in December, the… Read More
John Remus
In its monthly report of Missouri River reservoir conditions, the Corps of Engineers said August 7 that higher-than-average releases are planned from all Missouri River projects through November. “Due to… Read More
The Corps of Engineers’ Missouri River Basin Water Management Division plans to maintain higher-than-average releases from reservoirs in the upper Missouri basin through the summer and fall. That means that… Read More
The Corps of Engineers will maintain higher-than-average releases from Gavins Point Dam into the Missouri River over the next few months, the Corps’ Missouri River Basin Water Management Division said… Read More
The Corps of Engineers Missouri River Basin Water Management Division announced May 22 it has increased releases from Fort Peck and Garrison dams due to high inflows from rapidly melting… Read More
The Corps of Engineers has increased its Missouri Basin runoff forecast for 2018 to 30.2 million acre feet (maf.). The forecast has been increasing each month this year; in March,… Read More
The Corps of Engineers’ Missouri River Water Management Division has raised its forecast of Missouri River Basin runoff in 2018. The Corps now expects 29 million acre feet (maf.) of… Read More
All 2017 stored flood waters were evacuated from the Missouri River mainstem reservoir system as of January 15, when the total volume stored in the system reached 56.1 million acre-feet… Read More
The Corps is continuing to prepare the Missouri River Mainstem Reservoir System for the upcoming runoff season, according to a January 9 conference call. Current Gavins Point Dam releases are… Read More
The Corps of Engineers reduced releases from Gavins Point Dam to the winter release rate of 21,500 cubic feet per second (cfs.) on December 4, ending the navigation season on… Read More