The St. Paul Engineer District recently awarded an $18 million contract to G&G Steel Inc., of Russellville, Ala., for the fabrication of new miter gates at Lock 3, near Welch,… Read More
g&g steel
G&G Steel recently completed work on new upper and lower gates for Upper Mississippi River Lock 12. The upper gate is 25 feet tall by 62 feet wide and weighs 110 tons… Read More
With the ribbon-cutting ceremony for Olmsted Locks and Dam underway the day this story went to press—August 30—G&G Steel made sure to be present for the momentous occasion. The fabrication… Read More
As it weaves through the wooded hills of Tuscaloosa County, Ala., the Black Warrior River tumbles from an elevation of near 240 feet to below 100 feet in a span… Read More
G&G Steel, Iuka, Miss., has constructed a lower miter gate for the Mobile Engineer District. The gate, which is destined for Holt Lock and Dam on the Black Warrior River… Read More