The long-anticipated closures of six of the aging locks and dams on the Illinois River began July 1 and so far, at least, have gone smoothly, according to those supervising… Read More
Chicago
Kindra Marine announced last week that it has acquired a 1,200-ton drydock. The dock, which measures 140 feet long by 50 feet wide with 42 feet between the wing walls,… Read More
The Chicago Engineer District has extended the comment period for the Chicago Area Waterway System (CAWS) Dredged Material Management Plan (DMMP), and integrated Environmental Impact Statement. Comments were originally due… Read More
Ozinga Materials & Logistics reached a milestone earlier this year when it loaded out its first barge of limestone from a new port it is developing on the Illinois Waterway. Read More
Watco Companies LLC, Pittsburg, Kan., announced February 22 that after considering the concerns of the community, Alderwoman Susan Sadlowski-Garza, the Chicago Department of Public Health (CDPH), and the Environmental Protection… Read More
TPG Chicago Dry Dock LLC was busy last week putting the finishing touches on upgrades to the mv. Nathan S for Calumet River Fleeting, which will perform additional upgrades to… Read More
Kindra Lake Towing LP, Chicago, Ill., announced that it received its first Certificate of Inspection (COI) for the mv. Morgan on October 31. The COI was presented to John Kindra,… Read More
Kindra Lake Towing moved a 300-ton crawler crane on a Poseidon sectional barge flotilla on September 15. The flotilla was moved from Calumet Harbor to Chicago Harbor in Illinois via… Read More
The Coast Guard located a motor vessel with 49 people aboard after one of the passengers called 911 stating she was concerned that the operator had become disoriented in heavy… Read More
Illinois is willing to work with the Corps of Engineers on the Brandon Road Lock and Dam Asian carp control project—but it wants to keep talking about the best ways… Read More