On December 21 with the completion of a project in Westhampton New York the U.S. Army Corps of Engineers North Atlantic Division finished its last 25 emergency beach repair projects authorized after Hurricane Sandy. Read More
Search Results
10 results for the search "new" were found.
The Caño Martín Peña is filled with trash and debris including sewage which poses serious human health issues. The governor of Puerto Rico has asked the U.S. federal government to spend… Read More
The Caño Martín Peña is filled with trash and debris including sewage which poses serious human health issues. The governor of Puerto Rico has asked the U.S. federal government to spend… Read More
Damen Dredge Equipment refit UK Dredging’s UKD Bluefin with a dredging monitoring system for trailing pipe and loading process monitoring. The project made use of the existing sensors on-board. The new monitoring system allows… Read More
Damen Dredge Equipment refit UK Dredging’s UKD Bluefin with a dredging monitoring system for trailing pipe and loading process monitoring. The project made use of the existing sensors on-board. The new monitoring system allows… Read More
Poplar Island approximately 15 miles south of the Chesapeake Bay Bridge is an environmental restoration project and placement site for maintenance material from the Chesapeake Bay navigation channels in Maryland. Its official name is the… Read More
Poplar Island approximately 15 miles south of the Chesapeake Bay Bridge is an environmental restoration project and placement site for maintenance material from the Chesapeake Bay navigation channels in Maryland. Its official name is the… Read More
VOSTA LMB has designed and tested a new quick connect dredge hose coupling. Vosta said the new coupling was developed to enhance safety and to make the assembly and disassembly procedures for floating… Read More