Poplar Island approximately 15 miles south of the Chesapeake Bay Bridge is an environmental restoration project and placement site for maintenance material from the Chesapeake Bay navigation channels in Maryland. Its official name is the… Read More
Business and Finance
VOSTA LMB has designed and tested a new quick connect dredge hose coupling. Vosta said the new coupling was developed to enhance safety and to make the assembly and disassembly procedures for floating… Read More
VOSTA LMB has designed and tested a new quick connect dredge hose coupling. Vosta said the new coupling was developed to enhance safety and to make the assembly and disassembly procedures for floating… Read More
Particle tracking technology from Partrac has been featured in a project by Jack Poleykett Ph.D. from the Centre for Global Eco Innovation at Lancaster University. Partrac said the study aims to improve… Read More
Particle tracking technology from Partrac has been featured in a project by Jack Poleykett Ph.D. from the Centre for Global Eco Innovation at Lancaster University. Partrac said the study aims to improve… Read More
Damen Dredging Equipment expanded its DOP submersible dredge pump range from the smallest DOP150 fitting in any corner to the DOP450L which can mix 4000 cubic meters (about 5232 cubic yards) per hour. The… Read More
Damen Dredging Equipment expanded its DOP submersible dredge pump range from the smallest DOP150 fitting in any corner to the DOP450L which can mix 4000 cubic meters (about 5232 cubic yards) per hour. The… Read More
ANAMAR completed the sediment and water sampling of the St. Johns River Florida in early December. The work was in support of the U.S. Army Corps of Engineers’ project to deepen and widen the… Read More